The first task after installation of placer gold equipment
After the installation of the screening operation of the placer gold equipment, the test run of the empty car shall be carried out, the installation quality shall be initially checked, and the necessary adjustment of the placer gold equipment shall be made. (1) the placer gold panning equipment should run empty, the time should not be less than 8H, in this event, observe whether the screen start smooth, fast, no special noise, observe whether the screen amplitude meets the requirements. (2) the screen box vibration should not produce yaw when placer gold panning equipment is running. If Yaw occurs, it may be due to the excessive height difference between the springs on both sides, the uneven tension of the hanging wire rope, the non-horizontal rotating shaft or the tight triangle tape, adjustments should be made accordingly. (3) within 4 hours of starting the Gold Pan, the bearing temperature increases and then remains stable, with the maximum temperature not exceeding 75 °C. (4) if there is abnormal noise after starting operation of the Gold Pan, or if the temperature of the bearing rises sharply, the machine should be stopped immediately to check whether the shaft rotates flexibly and whether the lubrication is good, etc. . (5) placer gold panning equipment starting 2-4 hours, stopping to check whether the connecting parts are loose, if there is loose to be fixed before starting. (6) if there is no fault in the 8-hour trial run of gold-digging equipment, the installation project shall be checked and accepted.
Recently Posted
-
Features of gold-mining equipment
December 23, 2019The panning equipment is a combined mining and mining unit built on an engineering flat-bottomed ship and floating on the water su
Read More -
New type of sand making machine
December 16, 2019The new Type sand-making machine has the following characteristics: small size of discharge, uniform shape, large production capacity, long life of hammer head, small matching power, changing three-stage crushing to two-stage crushing, simplified process, simple structure, convenient maintenance and stable operation. The equipment investment is 35%-50% lower than that of the same scale traditional process equipment, and the oRead More -
What is the role of water wheel sand washing machine?
December 16, 2019The role of water wheel sand washing machine: 1, can effectively prevent the subsequent link equipment clogging. When the ore containing more mud is treated, the mud in the ore will easily block the equipment such as the ore Bin, the clay trough, the funnel and the crushing and screening, which will affect the working efficiency of the crushing and screening equipment, resulting in the reduction of the treatment capacity andRead More -
Design of gear wear for reselecting equipment ball grinder
November 6, 2019What are the causes of gear wear in the ball grinder? How to solve the wear problem? Below we summarize some of the ball mill gear
Read More